Preliminaries

Also called: prelims · preliminary items · general items

The section of a construction bill covering the cost of running the site rather than building any part of it: set-up, temporary works, supervision, insurance, site water and power, and securing the works.

Preliminaries are everything a contractor spends that does not end up as a wall. The site hoarding. The store and the site office. Temporary water and power. Scaffolding. The foreman's time. Insurance for the works. Cleaning and clearing at the end. Securing the site overnight.

It is the section owners skim, because nothing in it is visible in the finished house, and it is regularly a significant share of the contract sum. It is also, for the same reason, where a quote that looks competitive hides what it has left out.

Why the section exists at all

These costs are real, they are incurred whether or not a single block is laid, and most of them scale with time rather than with quantity. A contractor on site for eight months carries eight months of supervision, security and site facilities. The same works completed in five months carry five.

That is the important property of preliminaries and the one that catches people: they are time-related. If a build runs four months late, a meaningful part of the extra cost is not extra work. It is extra weeks of running a site, and the claim for it is legitimate.

What is usually in the section

  • Site establishment: hoarding, access, site office, store, sanitation, signage.
  • Temporary services: water and power connections for construction, and the consumption.
  • Supervision: the contractor's site management, which is not in the trade rates.
  • Plant and scaffolding held on site rather than hired per task.
  • Insurance: contractors' all risks, public liability, and workmen's cover.
  • Security: the watchman, the lighting, anything that stops material walking.
  • Compliance: statutory notices, safety provision, and the paperwork the works require.
  • Completion items: clearing away, making good, final cleaning.

How to read them

Compare the preliminaries figure between two tenders as a percentage of each tender total, not in shillings. A contractor who has priced the section honestly and a contractor who has quietly buried the same costs inside the trade rates will look very different in the prelims line and very similar at the bottom.

Then ask the more useful question: which of these are time-related, and what happens if the programme slips? A contract that is silent on this is a contract where the answer gets negotiated after the slip has already happened, which is the worst moment to be discussing it.

What goes wrong

A suspiciously low prelims figure. It rarely means the contractor will spend less on running the site. It usually means the cost has been moved into the measured rates, where it is harder to see and harder to adjust when the scope changes.

No allowance for the site being difficult. A steep plot, a tight urban site with no storage, or an access road a lorry cannot use are all preliminaries problems, and they are all cheaper to price than to discover.

Prolongation nobody planned for. Where the works are extended, the time-related preliminaries continue. On a build with several variations, the programme moves and the prelims move with it, which is why the running total of approved variations should carry a time column as well as a cost one.

Common questions

What percentage of a build is preliminaries?
It varies with the site, the programme and the type of works, and any single figure quoted as a rule is unreliable. The useful test is not the percentage but the comparison: price the same works with two contractors and look at how differently they have split cost between preliminaries and trade rates.
Are preliminaries negotiable?
The items are, and they should be discussed rather than accepted as a block. Ask what each one covers and which items are time-related, because those are the ones that grow if the programme slips.
Why did my preliminaries increase when the build ran late?
Because most of the section is priced per week rather than per unit of work. Supervision, security, site facilities, scaffolding and insurance all continue while the site is open, so an extended programme carries extended preliminaries even where no extra building work was done.

Read more on this

Last reviewed 18 September 2026. This entry explains how the instrument works and is not legal or financial advice.